PROJECTS: Sandhog Images

Heading to rock face for drill and blast, feb. 2004.

Heading to rock face for drill and blast, feb. 2004.

Archival Pigment Print.

Kenneth Schnell at bottom of shaft, shaft-to-tunnel transition, June 2008. 
 Pete Reynolds, safety chief, walking to cage at dawn, Sep. 2004. 
cage ride down, swing shift, Mar. 2004.
 John Wademan, 3rd generation hog, at door of concreting form, sep. 2007.
Richard Brodala heading north on tracks from cage, dec. 2006.
Jim O’donnell, 2nd generation hog of 26 yrs., blowing out muck cars of mined rock, July 2005. 
Terrance Hickey, hog of 30 yrs., splashlight studios nYc, nov. 2004.
Brian Thorne, 3rd generation hog of 26 yrs., splashlight studios nYc, nov. 2004.
 CWT #3 main access shaft and worksite, Westside nYc, Jan. 2008. 
Neil Hickey, splashlight studios nYc, nov. 2004. 
Neil Hickey, splashlight studios nYc, nov. 2004. 
Mike Warfield, splashlight studios nYc, nov. 2004. 
Graveyard shift, concreting forms, feb. 2008.page	84: Work in north tunnel, 12 ft. in diameter, nov. 2006. 
Kerwin A. Antoine, July 2005. 
Bottom of shaft, feb. 2007.
Dale Estus, 2nd generation hog of 39 yrs., splashlight studios nYc, nov. 2004.
Day shift loading a shot of 400 lb. of dynamite, aug. 2004. 
Left image: Sandhogs moving Eye Seal of the TBM against the rock, Sunny Sides Yards in Queens, East Side Access Project, February 2011.
Right image: Cutterhead of Tunnel Boring Machine, Suuny Side Yards in Queens to Manhattan.  East Side Access Project, February  2011.
East Side Access Project, underneath Grand Central Terminal, Madison Yards, February 2011
Work in north tunnel, 12 ft. in diameter, nov. 2006. 
Lower and upper tunnel, croton filtration plant, Van cortlandt park, Bronx, oct. 2008. 
Patrick Donovan, graveyard shift, June 2008.
Chain hoists, aug. 2007. page	67: changing of shifts, feb. 2007. 
Hoisting muck loads up shaft, shaft-to-tunnel transition, June 2008.  
Patrick Donovan, bottom of shaft, June 2008. 
Mike Warfield, hog of 29 yrs., operates hydraulic jumbo drill for dynamite placement, July 2004. 
Joe Picozzi, invert drilling, feb. 2007. 
Concreting forms and invert drilling, bottom of shaft, feb. 2008. 
Thomas Weller and Mark Barrett, 2nd generation hogs, leaving work, croton filtration plant, Van cortlandt park, Bronx, oct. 2008. 
Construction of access shaft and distribution box of cWt#3, sep. 2005. 
Andy Hickey and Jim and eamonn o’donnell hoist a 20 ton locomotive to the surface, dec. 2006.
S. Chessman, P. Coyne, W. gavin, M. Barrett & N. Thomas stand on cutting head of tunnel Boring Machine (tBM) in east tunnel, nov. 2006.
Jason Mccormick and Eammon Greenan, jackleg drilling into bedrock of north tunnel, oct. 2005. 
Irwin sylvester, tunnel’s break room, feb. 2008. 
John Kohl, Jr. and John Kohl, sr., June 2004.
Hydraulic jumbo drill in reflection, Mar. 2005. 
Lower and upper tunnel, croton filtration plant, Van cortlandt park, Bronx, sep. 2008.  
Heading to rock face for drill and blast, feb. 2004.
Cutting head of TBM, dec. 2006.
Respite in mined tunnel, croton filtration plant, Van cortlandt park, Bronx, oct. 2008. 
John hammer at heading, south tunnel, apr. 2007.
James Fitzroy, hog of 9 yrs., splashlight studios nYc, nov. 2004. 
South tunnel, bored and unconcreted, sep. 2004. 
Looking up shaft, 800 ft. from underground, nov. 2006.